10-11-21 Week 4
- thelilsarahjane
- Oct 11, 2021
- 1 min read
Week 3 (treatments 16-19) had some ups and downs, which required headache management. Aided by my family and scrupulous notes, we got through.
There was a likelihood that hair could start falling out as early as Week 2. Promise delivered - with a radiation burn.

Abbey and Patrick have been going full tilt to install the bathroom. Even though the plumber suggested to have an observation hole from the basement, to the base of the bathroom to monitor leaks, if there is a problem, they would need to rip out the entire system… including the tile Abbey and Juan are doing later this week! Abbey and Patrick need to be accurate and figure out pitch etc do the shower doesn’t drain into the subfloor.
Aided by, a contractor and electrician, the door to the house/In-Lawn unit has been moved and the double-door doorframe to the kitchen shrunk.



I love the goat in the last shot. :)
I appreciate your brave & honest words Sarah. Your home & the work they are doing looks amazing.