top of page
Search

10-11-21 Week 4

  • thelilsarahjane
  • Oct 11, 2021
  • 1 min read

Week 3 (treatments 16-19) had some ups and downs, which required headache management. Aided by my family and scrupulous notes, we got through.

There was a likelihood that hair could start falling out as early as Week 2. Promise delivered - with a radiation burn.



Abbey and Patrick have been going full tilt to install the bathroom. Even though the plumber suggested to have an observation hole from the basement, to the base of the bathroom to monitor leaks, if there is a problem, they would need to rip out the entire system… including the tile Abbey and Juan are doing later this week! Abbey and Patrick need to be accurate and figure out pitch etc do the shower doesn’t drain into the subfloor.


Aided by, a contractor and electrician, the door to the house/In-Lawn unit has been moved and the double-door doorframe to the kitchen shrunk.






Future Former Door

 
 
 

2 Comments


Janet Galasso
Janet Galasso
Jan 16, 2022

I love the goat in the last shot. :)

Like

Pamela Hill
Pamela Hill
Oct 25, 2021

I appreciate your brave & honest words Sarah. Your home & the work they are doing looks amazing.

Like

© 2023 by Abbey Taylor

Proudly created with Wix.com
 

CONNECT​ WITH US:​​

  • w-flickr
  • w-rss
  • w-vimeo
  • youtube

SUBSCRIBE:​​

50 West Mountain Lane

Roxbury, CT 067873

info@mysite.com

Online info available 24/7

We do our best to answer your questions as quickly as we can.  It is a single family who runs this site and we strive to do our best to bring you the most up to date information we have.

ADDRESS

coming soon

Email Questions

Subscribe Now

Thanks for submitting!

TEL

Not Available at This Time
bottom of page